top of page

REINFORCEMENT & PREPARATION WORKS

The ICD Team install a range of reinforcement and preparation works including traditional methods such as mesh and re-bar to all drawing specifications. We also use newer methods such as fibres in concrete a efficient alternative to standard mesh(steel/poly). We also install shuttering,formwork,k form, membranes and insulation.

CONTACT US TODAY

© 2023 by Integral Concrete. Proudly created by DPLgraphics.co.uk

  • Instagram
  • Facebook
bottom of page