top of page

REINFORCEMENT & PREPARATION WORKS
The ICD Team install a range of reinforcement and preparation works including traditional methods such as mesh and re-bar to all drawing specifications. We also use newer methods such as fibres in concrete a efficient alternative to standard mesh(steel/poly). We also install shuttering,formwork,k form, membranes and insulation.
bottom of page